Mineral Reserve Estimate
The Mineral Reserve Estimate presented in Table 2 was prepared by Independent Qualified Person Joanne Robinson, P.Eng., of Nordmin.
Table 2: Mineral Reserve Statement for the Goldboro Gold Project – Effective Date of December 15, 2021
Category |
Area |
Cut-off Grade (g/t gold) |
Tonnes (t) |
Diluted Grade (g/t gold) |
Contained Gold Metal (Troy ounces) |
Probable Mineral Reserve |
East Pit |
0.45 g/t |
5,468,300 |
2.54 |
446,000 |
Probable Mineral Reserve |
West Pit |
0.45 g/t |
10,330,600 |
2.12 |
704,200 |
Total |
0.45 g/t |
15,798,900 |
2.26 |
1,150,200 |
Mineral Reserve Estimate Notes
Mineral Resource Estimate
The Mineral Resource Estimate presented in Table 3 was prepared by Independent Qualified Person Glen Kuntz, P. Geo., of Nordmin. The Mineral Resource Estimate is based on validated results of 681 surface and underground drill holes for a total of 121,540 metres of diamond drilling completed between 1984 and the effective date of November 15, 2021, including 55,803 metres conducted by Anaconda.
Table 3: Mineral Resource Estimate for the Goldboro Gold Project – Effective Date November 15, 2021
Resource Type |
Gold Cut-off (g/t gold) |
Category |
Tonnes |
Grade (g/t gold) |
Gold Troy Ounces |
Open Pit |
0.45 |
Measured |
7,680,000 |
2.76 |
681,000 |
Indicated |
7,988,000 |
2.89 |
741,000 |
||
Measured + Indicated |
15,668,000 |
2.82 |
1,422,000 |
||
Inferred |
975,000 |
2.11 |
66,000 |
||
Underground |
2.40 |
Measured |
1,576,000 |
7.45 |
377,000 |
Indicated |
4,350,000 |
5.59 |
782,000 |
||
Measured + Indicated |
5,925,000 |
6.09 |
1,159,000 |
||
Inferred |
2,206,000 |
5.89 |
418,000 |
||
Combined Open Pit and Underground* |
0.45 and 2.40
|
Measured |
9,255,000 |
3.56 |
1,058,000 |
Indicated |
12,338,000 |
3.84 |
1,523,000 |
||
Measured + Indicated |
21,593,000 |
3.72 |
2,581,000 |
||
Inferred |
3,181,000 |
4.73 |
484,000 |
* Combined Open Pit and Underground Mineral Resources; The Open Pit Mineral Resource is based on a 0.45 g/t gold cut-off grade, and the Underground Mineral Resource is based on 2.40 g/t gold cut-off grade.
Mineral Resource Estimate Notes
Reported from within a mineralization envelope accounting for mineral continuity.